[1]
Topan, ., Lopa, R.T. and Bakri, B. 2025. The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6. Engineering, Technology & Applied Science Research. 15, 5 (Oct. 2025), 27400–27405. DOI:https://doi.org/10.48084/etasr.13165.