[1]
Sohu, S. et al. 2024. Influential Time and Cost Factors for Commercial Projects in the Malaysian Construction Industry. Engineering, Technology & Applied Science Research. 14, 3 (Jun. 2024), 14170–14174. DOI:https://doi.org/10.48084/etasr.7037.