[1]
Abu Mwais, A. and Mahamid, I. 2025. Using a Fuzzy Model to Evaluate Risks caused by Variation Orders in Construction Projects. Engineering, Technology & Applied Science Research. 15, 1 (Feb. 2025), 19030–19036. DOI:https://doi.org/10.48084/etasr.8558.