[1]
Fadjar, A., Akbar Ali, A. and Setiawan, A. 2025. Resource Utilization and Repetitive Construction Scheduling using the Discrete Event Simulation Method. Engineering, Technology & Applied Science Research. 15, 2 (Apr. 2025), 20702–20708. DOI:https://doi.org/10.48084/etasr.9795.