(1)
Al Ahmad, M. H.; Arifuddin, R.; Abdurrahman, M. A. Cost Overrun Factors in Construction Projects: A BIM and SEM Analysis. Eng. Technol. Appl. Sci. Res. 2026, 16, 33365-33374.