(1)
Musonda, J.; Mwero, J. N.; Abongo, K. Performance of UPVC RC-Filled Pipe Columns Exposed to Thermal Cyclic Loading. Eng. Technol. Appl. Sci. Res. 2025, 15, 21232-21242.