Topan, ., Lopa, R. T., & Bakri, B. (2025). The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6. Engineering, Technology & Applied Science Research, 15(5), 27400–27405. https://doi.org/10.48084/etasr.13165