Fadjar, A., Akbar Ali, A., & Setiawan, A. (2025). Resource Utilization and Repetitive Construction Scheduling using the Discrete Event Simulation Method. Engineering, Technology & Applied Science Research, 15(2), 20702–20708. https://doi.org/10.48084/etasr.9795