TOPAN, .; LOPA, R. T.; BAKRI, B. The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6. Engineering, Technology & Applied Science Research, Greece, v. 15, n. 5, p. 27400–27405, 2025. DOI: 10.48084/etasr.13165. Disponível em: https://mail.etasr.com/index.php/ETASR/article/view/13165. Acesso em: 19 may. 2026.