Fadjar, A., Akbar Ali, A. and Setiawan, A. (2025) “Resource Utilization and Repetitive Construction Scheduling using the Discrete Event Simulation Method”, Engineering, Technology & Applied Science Research. Greece, 15(2), pp. 20702–20708. doi: 10.48084/etasr.9795.