[1]
. Topan, R. T. Lopa, and B. Bakri, “The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6”, Eng. Technol. Appl. Sci. Res., vol. 15, no. 5, pp. 27400–27405, Oct. 2025.