[1]
. Ateekh-Ur-Rehman and Y. S. Usmani, “Field Engineers’ Scheduling at Oil Rigs: a Case Study”,
Eng. Technol. Appl. Sci. Res.
, vol. 2, no. 1, pp. 155–161, Feb. 2012.