[1]
A. Fadjar, A. Akbar Ali, and A. Setiawan, “Resource Utilization and Repetitive Construction Scheduling using the Discrete Event Simulation Method”, Eng. Technol. Appl. Sci. Res., vol. 15, no. 2, pp. 20702–20708, Apr. 2025.