1.
Topan ., Lopa RT, Bakri B. The Impact of Land Acquisition Delays on Time and Cost Performance in Construction Projects: A Case Study of the Bekasi River Flood Control Project Package 6. Eng. Technol. Appl. Sci. Res. [Internet]. 2025 Oct. 6 [cited 2026 May 18];15(5):27400-5. Available from: https://mail.etasr.com/index.php/ETASR/article/view/13165